Главная  /  Наука и инновации  /  Вестник Чувашского университета  /  Metadata for the articles  /  Vestnik Chuvashskogo universiteta, 2021, no. 2. Topic of this Issue: Historical Sciences  /  PLANS FOR THE CONSTRUCTION OF THE CHEBOKSARY HYDROELECTRIC POWER STATION IN THE 1940s

PLANS FOR THE CONSTRUCTION OF THE CHEBOKSARY HYDROELECTRIC POWER STATION IN THE 1940s

Elena K. Mineeva, Nadezhda G. Rusinova

DOI: 10.47026/1810-1909-2021-2-127-132

Key words

Cheboksary hydroelectric power station, the Great Volga, design and survey works, dam, dam location, construction sequence.

Annotation

In the year of Cheboksary hydroelectric power station’s anniversary, the authors of the article aim to investigate the issue of the waterworks facility’s formation in the early 40s of the last century. Based on the principles of historicism and objective analysis, the main stages of implementing the HPP construction plan are considered. The article presents archival documents which examine the problems of decision-making on the construction of the object. The issue of constructing hydroelectric power stations on the Volga, in particular in the territory of Chuvashia, was studied in the specially created Bureau “The Great Volga”. Simultaneously with the construction of Cheboksary HPP, the construction of two more stations – Yaroslav­skaya and Balakhninskaya – was considered. The authors present comparative characteristics of the objects. Cheboksary hydroelectric power plant in terms of its performance significantly exceeded other structures. The article notes that prior to the construction of the station, a lot of preparatory and survey work was carried out, which was limited by a tight deadline. As a result of examining the scope of work, material resources and labor costs, the construction of the station was postponed to a later date. Scientists and engineers recognized the priority need to build less powerful stations. The materials of the article can be used for further research of this topic, as well as when writing regional natural history works.

References

  1. Avdanin V.V. Sto let elektrifikatsii: istoricheskii opyt i sovremennye vyzovy [100 years of electrification: historical experience and modern challenges]. Historical Search, 2020, vol. 1, no. 3, pp. 5–13. DOI: 10.47026/2712-9454-2020-1-3-5-13.
  2. General’nyi plan elektrifikatsii SSSR [General plan of electrification of the USSR]. Moscow, 1932, vol. 8, 855 p.
  3. Gosudarstvennyi istoricheskii arkhiv Chuvashskoi Gosudarstvennyi Respubliki. Fond 210. Opis’ 12 Dokument 55 [State Historical Archives of the Chuvash Republic. Archives 210 Anagraph 12 Document 55].
  4. Gosudarstvennyi istoricheskii arkhiv Chuvashskoi Gosudarstvennyi Respubliki. Fond R-147. Opis’ 1. Dokument 643 [State Historical Archives of the Chuvash Republic. Archives R-147. Anagraph 1. Document 643].
  5. Gosudarstvennyi istoricheskii arkhiv Chuvashskoi Gosudarstvennyi Respubliki. Fond 210. Opis’ 12. Dokument 80 [State Historical Archives of the Chuvash Republic. Archives 210. Anagraph 12. Document 80].
  6. Gosudarstvennyi arkhiv sovremennoi istorii Chuvashskoi Respubliki. Fond P-1. Opis’ 13. Dokument 118 [State Archive of the Modern History of the Chuvash Republic. Archives P-1. Anagraph 13. Document 118].
  7. Gosudarstvennyi arkhiv sovremennoi istorii Chuvashskoi Respubliki Fond P-1. Opis’ 13. Dokument 71 [State Archive of the Modern History of the Chuvash Republic. Archives P-1. Anagraph 13. Document 71].
  8. Kukel’-Kraevskii S.A. Energoekonomicheskii analiz tekhnicheskoi rekonstruktsii Bol’shoi Volgi [Energy-economic analysis of the technical reconstruction of the Great Volga]. Leningrad, AN USSR Publ., 1934, 74 p.
  9. Mineeva E.K. Stanovlenie Mariiskoi, Mordovskoi i Chuvashskoi ASSR kak natsional’no-territorial’nyx avtonomiy (1920 – 1930-e gody) [The formation of the Mari, Mordovian and Chuvash Autonomous Soviet Socialist Republic as national-territorial autonomies (1920–1930s)]. Cheboksary, Chuvash State Univesity Publ., 2009, 594 p.
  10. Plan elektrifikatsii RSFSR [Plan for electrification of the RSFSR]. Moscow, Gospolitizdat Publ., 1955, 665 p.
  11. Rimanov I.F., Yudkovskii A.G. Cheboksarskaya GES [Cheboksary HPP]. Cheboksary, Chuvashknigoizdat Publ., 1979, 112 p.
  12. Rusinova N.G. Stanovlenie i razvitie Cheboksarskoi GES: k istoriografii voprosa [Evolvement and development of Cheboksary HPP: to the historiography of the issue]. Historical Search, 2020, vol. 1, no. 3, pp. 75–80. DOI: 10.47026/2712-9454-2020-1-3-75-80.

Information about the authors

Elena K. Mineeva – Doctor of Historical Sciences, Professor, Russian History Depart­ment, Chuvash State University, Russia, Cheboksary (mineevaek21@mail.ru; ORCID: https://orcid.org/0000-0001-8301-9951).

Nadezhda G. Rusinova – Post-Graduate Student, Russian History Depart­ment, Chuvash State University, Russia, Cheboksary (rusinovang@mail.ru; ORCID: https://orcid.org/0000-0003-0983-141X).

For citations

Mineeva E.K., Rusinova N.G. PLANS FOR THE CONSTRUCTION OF THE CHEBOKSARY HYDROELECTRIC POWER STATION IN THE 1940s. Vestnik Chuvashskogo universiteta, 2021, no. 2, pp. 127–132. DOI: 10.47026/1810-1909-2021-2-127-132 (in Russian).

Download the full article